Emergency Management for Warehousing & Logistics
Industrial compliance isn't just about floor tape. It's managing Dangerous Goods (DG), high-bay fire hazards, and the critical separation of heavy machinery and people during a crisis.
Technical Authority
Dangerous Goods & High-Bay Realities.
Logistics sites present unique fire-loading risks. High-bay storage can accelerate fire spread vertically beyond standard response times. We provide AS3745-compliant plans that integrate with your specific fire engineering and racking specifications.
Our specialists understand the nuances of AS1940 (Dangerous Goods storage) and how it affects manifest requirements and assembly point locations.
DG Manifests
Technical mapping of hazardous material locations.
Industrial PEEPS
MHE and heavy vehicle separation protocols.
Industrial Checklist
- Manifest boxes and Dangerous Goods (DG) documentation technical audits.
- Assembly points verified for safety against wind-borne plume smoke from hazmat.
- ECO training for Chief Wardens that includes heavy MHE shutdown protocols.
- Evacuation Diagrams showing site-specific hydrant and booster locations.
- Technical validation of pedestrian-only emergency egress routes.
"In a warehouse, an evacuation plan without MHE shutdown logic is just a wish."
— Industrial Compliance Lead, ComplianceReady
Precision Safety for Logistics Infrastructure
We solve the unique technical hazards of industrial sites.
High-Bay Fire Loading
Technical Loading
Our plans account for rapid-fire propagation inherent in high-bay racking and ensure that evacuation times are validated against actual site travel distances.
DG Manifest Audit
AS1940 / AS3745 Compliance
We ensure your Emergency Response Procedures (ERP) are perfectly aligned with your WHS manifest requirements for dangerous goods and hazardous chemicals.
Pedestrian Separation
MHE Exclusion Zones
We develop technical protocols that ensure all Materials Handling Equipment (MHE) is immediately neutralized and parked safely during an incident to prevent pedestrian conflict.
See where your facility stands
Choose a free on-site or online assessment — you decide what works best for your facility.
On-site or online
Review your arrangements with our specialists in the format that suits you.
Clear next steps
Identify documentation, training and facility priorities before they become costly gaps.
Your free review
Choose your time
Use our live calendar to book without back-and-forth emails.
Practical and focused
Get an informed view of your current emergency planning arrangements.
Free assessment. No obligation.
The 3 Fundamental Principles of the GM Standard
Non-negotiable operational standards for all ComplianceReady ECO training and emergency response.
Priorities in an Emergency
- 1.1Life Safety
Your life first, then all other human life. No exceptions.
- 1.2Property
- 1.3Return to Normality
Limit damage and prevent business interruption.
R.A.C.E (Operational Response)
- RRemove / RescueFrom immediate danger
- AAlert / AlarmRaise alarm, call 000
- CContainClose doors and windows
- EExtinguish / EvacuateExtinguish only if safe
Search & Sweep Procedures
Technical 'Sweep' Protocol
Warden-led, progressive, methodical room-to-room search. No backtracking. No skipped voids.
Room Marking
Clear visual indicators (markers, chalk, or post-its) required for all searched areas to prevent duplication.
Direct communication of 'Clear' status to Chief Warden is mandatory.