Home/Evacuation Diagrams
AS 3745 Compliant

Evacuation
Diagrams.

AS 3745-2010 compliant evacuation diagrams from site-verification to installation. We specialize in technical remediation for directors who require a defensible safety position.

14 DAYSDispatch or they are free

Fast-Track Compliance

"Competitors are slow. We aren't. We dispatch your compliant diagrams within 14 days or they are free."

  • Professional Aluminium Framed
  • Industrial Alupanel Mounts
  • Site-Verified Accuracy
  • 14-Day Dispatch Guarantee*

* Terms and conditions apply

Site-Verified Standards

Site Assessment

Comprehensive on-site assessment to ensure accurate floor plans and evacuation route mapping.

Professional Design

Clean, clear diagram design that meets AS 3745 requirements and is easy for occupants to understand.

Premium Materials

High-quality printing with lamination, aluminum frames, or Alupanel options to suit your facility.

Installation Service

Professional installation at correct heights and locations per AS 3745 specifications.

Material Specifications

Digital PDF

Digital precision for modern management.

  • Professional design
  • AS 3745 compliant
  • High-resolution PDF
  • Email delivery
  • Ready for printing
Request Quote

Printed & Laminated

Standard technical compliance for all zones.

  • High-resolution print
  • Heavy-duty 250mic lamination
  • Clean architectural drafting
  • Digital storage included
  • Audit-ready documentation
Request Quote

Aluminium Snap Framed

Our most popular option for professional facility finishes.

  • Silver matte snap frames
  • Anti-glare covers
  • Visual impact for high-traffic zones
  • Our Most Popular Choice
  • Easy update capability
Request Quote

Alupanel

A premium, durable finish for the discerning client.

  • UV-Stabilized Alupanel
  • High-impact resistance
  • Direct wall mounting
  • Designer architectural finish
  • Maximum durability
Request Quote

Dispatch Guarantee Terms

1. Supply-Only: Proof of tracking provided within 14 days of final payment/access.

2. Supply & Install: Installed within 14 days of final payment/access.

3. Site access must be provided at our behest or guarantee clock pauses.

4. Technical requirement: Client provides clean/closely accurate floor plans (PDF/Autocad).

Emergency Planning and Compliance Consultants | No liability for logistics or force majeure delays.